2000/2002 |
Polyolefin storage |
Chemopetrol, a.s
|
Czech Republic |
New high-capacity storage equipment for granulated PE and PP inclusive of expedition section. Total storage capacity: 9 000 t, 3 600 t in silos |
Engineering, procurement, construction |
|
2000/2002 |
Asphalt loading to trucks |
Ceska Rafinerska, a.s. |
Czech Republic |
Extension and renovation of loading asphalt to trucks |
Engineering, procurement, construction |
|
2000/2001 |
Tankfarm reconstruction |
Ceska Rafinerska, a.s. |
Czech Republic
|
Asphalt tankfarm reconstruction - pump-station and piping distribution system |
Engineering, procurement, construction
|
|
1998/2000 |
Carbohydrate storage, RL-9607 |
Ceska Rafinerska, a.s. |
Czech Republic |
Revamping of existing underground storage tanks and LPG store, construction of new VNR, LPG pump stations and loading of LPG into trucks (rail and road) |
Engineering, procurement, construction |
|
1998 |
Relocation of two production lines |
OMV CR
|
Czech Republic
|
Relocation of two production lines for polyolefins to new building including revamping of second lines |
Detail design |
|
1997/1999 |
Fuel depot |
CEPRO
|
Czech Republic |
Storage capacity: 4 500 m3, loading and unloading of fuels and lubricants for the territory of Moravia midland |
Design package, environmental impact assessment, procurement engineering, complex testing, geologic and geodetic survey |
|
1997/1998 |
Fuel loading facility |
CEPRO |
Czech Republic
|
Reconstruction of fuel loading ramps and facilities including injection of additives. Turnover of fuels: 77 000 m3/year |
Design package, supervision, geodetic survey |
|
1997/1998 |
Reconstruction of Fuel loading station |
CEPRO |
Czech Republic |
Reconstruction of fuel loading ramps and facilities including injection of additives. Turnover of fuels: 81 000 m3/year |
Design package, supervision, geodetic works |
|
1997/1998 |
Fuel loading facilities for trucks |
CEPRO |
Czech Republic
|
Reconstruction of existing ramps for fuel loading and facilities including injection of additives. Turnover of fuels: 91 000 t/year |
Design package, supervision, geodetic survey |
|
1997/1998 |
Adding fuel catalysts into gasoline and diesel fuels |
Ceska Rafinerska, a.s. |
Czech Republic |
Storage tanks for 8 kinds of additives, automatically operated truck loading |
Engineering, procurement, construction
|
|
1997 |
Pentane tank farm |
Kaucuk, Kralupy |
Czech Republic
|
Engineering for direct pumping of pentane from Ceska Rafinerska storage vessels, into polymerization reactors. Capacity: 500 l/min. Transport height - 65 m, length - 1300 m |
Detail design |
|
1996/1997 |
Isomeric linear alpha olefins (LAO production) |
Spolana, a.s.
|
Czech Republic |
Fraction ratio: LAO C16/C18 = 1/1. Capacity: app. 5000 t/year. |
Design package, EIA |
|
1996/1999 |
Bulk fuel storage facility |
OMV Slovak Rep. |
Slovak Republic |
Storage capacity: 4 000 m3, intake, storage and distribution of fuels on the west territory of Slovak Republic |
Design package, environmental impact assessment, subcontractor tendering, start-up assistance, geodetic and geologic survey |
|
1996/1998 |
Hydrocarbon vapours recovery |
CEPRO
|
Czech Republic
|
Reconstruction of fuel tanking ramps, product additivation, Hydrocarbon vapours recovery - 120 m3/hour. Turnover of fuels: 170 000 m3/year |
Design package, supervision |
|
1996 |
Fire safety evaluation study for petrochemical complex |
Chemopetrol, a.s |
Czech Republic |
Petrochemistry objects - polyolefin section |
Fire hazard analysis in compliance with Czech fire codes |
|
1995/1996 |
Fire hazard analyses |
Koramo |
Czech Republic |
Mineral oil refinery |
Fire safety evaluation study |
|
1984/1987 |
Lube oil complex |
SCOP |
Iraq |
Lube oil complex – tankfarm |
Complete design of the off-sites facilities |
|
1982/1988 |
Gas treatment plant and gas pipeline |
Syrian Petroleum Company
|
Syria |
Natural gas treatment plant DEA sweeting Salzgitter Lummus process. Construction of 600 km of gas pipeline |
Off-sites detail design, start-up, supervision |